KPI : Overall Equipment Effectiveness (OEE)


Overall Equipment Effectiveness (OEE)

Overall Equipment Effectiveness (OEE) = Availability x Performance x Quality

Availability = Operating Time / Planned Production Time

Performance = Ideal Cycle Time / (Operating Time / Total Pieces)

or

Performance = (Total Pieces / Operating Time) / Ideal Run Rate

Quality = Good Pieces / Total Pieces

Formula:

Availability x Performance x Quality

Unit type: Percentage

Direction: Maximize

Comments

Share & Subscribe

Please sign in or register in to view the subcategories and drill down to the specific KPIs within categories.

Sign in to KPI Library

 
Password:  (forgot password?)
  Remember me on this computer
 

Not yet a member? Join Now!

Popularity Rankings

Popularity ranking of KPIs is expressed by little green horizontal bars. The more green the bar is, the more populair the KPI is. Popularity of a KPI is calculated based on usage by the community.

People with an Enterprise plan see even more details about the popularity of KPIs: